NORECO ll
NEGROS ORIENTAL II ELECTRIC COOPERATIVE
CONSUMER TYPE | RATES per kWh |
---|---|
RESIDENTIAL | ₱12.1322 |
LOW VOLTAGE | ₱11.2828 |
HIGH VOLTAGE | ₱7.9025 |
PRE-MEMBERSHIP EDUCATION SEMINAR (PMES) SCHEDULE
FOR IN-HOUSE :
DATE: Every Friday
TIME: 8:00am -12:00noon
LOCATION: MAIN OFFICE
FOR ONLINE :
ONGOING MODIFICATION...
Site Visitors
SCHEDULED POWER OUTAGE
Advisory from the National Grid Corporation of the Philippines
Rescheduled power service interruption
Date of Interruption: March 22, 2025 (Saturday)
(instead of March 23, 2025, Sunday)
Time: 5:00 A.M. to 6:00 P.M.
REASON: NGCP will de-energize its Amlan–Siaton 69kV transmission line to continue the implementation of reconductoring or replacement of ACSR conductors from structures #65 to #98 and #144 to #171 simultaneously along the Amlan-Siaton 69 kV line.
The rescheduling of the activity is to make way for the request of Professional Regulation Commission as there will be a Licensure Examination for Teachers that day.
POWER RATES
Consumer Type | Previous Month Rate | Current Month Rate | Difference per kWh |
---|---|---|---|
RESIDENTIAL | ₱11.4898 | ₱12.1322 | +0.6424 |
LOW VOLTAGE | ₱10.6404 | ₱11.2828 | +0.6424 |
HIGH VOLTAGE | ₱7.8260 | ₱7.9025 | +0.0765 |